JSW Energy exceeded its FY25 operational capacity target of 10 GW, achieving profitability targets based on the exit run rate of its operational portfolio.
Following the achievement, the JSW Group company has revised its 2030 target to 30 GW of generation capacity and 40 GWh of energy storage, up from the previous goal of 20 GW generation capacity.
JSW Energy’s installed capacity surged 2.8 GW in the March quarter, driven by 478 MW of greenfield wind additions and 2,150 MW of thermal capacity addition. The increase coincides with the onset of the summer season in India when demand for power shoots up.
Net generation rose 24% to 7.9 billion units. Renewable energy generation during the quarter increased 32%, while net long-term PPA generation grew 28% YoY.